Our Green-IT energy costs counter is connected in the supply of the server room or data center, eg in the electrical distribution.
Over time (eg 1 month) of electricity consumed, reactive flows and other energy losses are measured.
Thereafter, improvement works take place in the server room, for example, the room temperature increased by 1-2 degrees.
Another month is measured, after which comparisons are made, and these showed the potential savings.
The evaluation is done over the network or a PC.
This process might be repeated.
The energy cost savings will pay for itself in no time, the cost of the energy cost meter,
this is also a model protects the environment and reducing CO2 emissions.